Recent Projects

Click on the picture for a larger view.

 

University Heating System Retrofit

A University had an existing system  that required insulation and corrosion protection.  The 112' section needed to be completed quickly so that the road could be opened.  The material was delivered at 6:30 AM and the installation was completed by 10:30 AM by the University personnel. 

 
       

 

Pre-insulated piping system repair

       
       
     
       

 

Condenser water piping at a Data Center

 
Multiple large diameter condenser water pipes. Vibrating Gilsulate 500XR is quick and easy. View from risers  

 

 

Pour nearing completion

 

Risers

 

The risers will be boxed in and filled with Gilsulate 500XR.  Once the backfill is placed a concrete cap will be poured around the riser with the pipe coming through a Pipeseal. Finished section prior to backfill.

 

The largest insulation delivery system on the market.

Large projects demand it.  The Gilsulate® 500XR insulation system was chosen, in part,  because it is the most cost effective product available to insulate and protect underground piping systems.  The semi-bulk bag contains 60 cubic feet and remains the largest installation delivery system on the market, nearly twice as much as competitive products.  Gilsulate International, Inc.'s commitment to maintaining a leadership position in the market means your installation will be completed in the most efficient means available.
 

refinery2.jpg (159636 bytes)

 

refinery3.jpg (186143 bytes) refinery4.jpg (170865 bytes)  

refinery5.jpg (179224 bytes)

 

This envelope is formed with sheetrock and steel re-rod bars.

Pouring Gilsulate® 500XR from a 60 cubic foot semi-bulk bag. Closer view of the crew placing the insulation material around the piping system. Crew finishing the installation.  The Gilsulate 500xr will be covered with a small layer of sand and the a light "green" concrete mix referred to as CLSM.

 

 

refinery7.jpg (197809 bytes)

 

 

refinery6.jpg (198507 bytes)

 

 

refineryberm.jpg (211035 bytes)

 

The crew is covering an unfinished section prior to the afternoon rains. The crew is required to wear full face respirators in this refinery when working with Gilsulate 500XR and other products considered a nuisance dust. Compacting soil above the berm.  The pipes are insulated with Gilsulate® 500XR.


 

These are pictures from an older project, again at a refinery.

 

 

refinerysemibulk.jpg (226251 bytes)

 

 

refinerysemibulkinstall.jpg (190339 bytes)

 

A front-end loader moving the semi-bulk bag to a staging area. A side-boom pipeline bulldozer used to place the Gilsulate® 500XR.


 

These are pictures of an installation at a hospital.  

 

 

scan0008.jpg (429506 bytes)

 

 

scan0005.jpg (395655 bytes)

 

scan0007.jpg (356382 bytes)

 

scan0004.jpg (379373 bytes)

 

The piping system is suspended in place on this project. This is the preferred method. 

The expansion elbows and a specified distance from them, have fiber glass pipe insulation on them to absorb the expansion and flex in the piping system.

 

Here is a typical guide the keeps the pipe moving in a straight line toward the expansion elbow.

The piping system is suspended, formed and ready for insulation placement.

 

scan0009.jpg (434013 bytes)

 

scan0006.jpg (354995 bytes)

 

scan0001.jpg (387263 bytes)

 

scan0002.jpg (339288 bytes)

 

A bulkhead is temporarily placed for the crew to work up to prior to leaving for the day.  The bulkhead is removed prior to commencing work the next day.

 

The insulation is poured in "lifts" or layers.   The first layer is poured to the top of the pipe and consolidated with a wand-type vibrator.  

The second lift is poured to the top of the pre-cut forms and vibrated.

A completed section prior to back fill.

 

scan0003.jpg (372315 bytes)

 

Another view of a completed section prior to back fill.


 

The following are not projects for Macintyre and Company.  They are however, great pictures that provide good detail of the product.

A multiple piping system being insulated with Gilsulate® 500XR.  This hot oil piping system runs through a nature preserve in Canada.

 

scan0010.jpg (529578 bytes)

 

Placing Gilsulate 500XR using the Semi-bulk bags.

     

 
A college campus high temperature hot water supply & return system.

 

 

Gilsulate 500XR is the only granular insulation with the load bearing properties allowing you to walk on the product.  Vibrating Gilsulate 500XR is quick and easy. Preparing to insulate the loop. A view of a completed section.
       

 

This a truckload, 1,080 cubic feet,  of 1 cubic foot bags being delivered to a jobsite.

truckloadbags.jpg (161053 bytes)